Two models for every project need.
NEAR operates as both a technology supplier and a turnkey developer. Choose the model that fits your operational structure.
Choose the collaboration model best suited to your project.
From turnkey plant to technology supply only: NEAR is as flexible as your business plan requires.
Complete Plant
Turnkey
This option includes import, transportation and development of the entire plant. The client can take advantage of every step required to build the plant, from technology to supply chain strength.
- – Technology supply (turbines and BESS)
- – Import and transportation
- – Plant development and construction
- – Full supply chain support
Technology Only
Technology supply
This option is designed for technology supply only. It allows the purchase of turbines and BESS, excluding the supply chain and transportation of technologies.
- – Turbine and BESS system supply
- – Technical support
- – Documentation and specifications
The most common questions about the purchasing process.
The process unfolds in four phases: (1) Site analysis — wind resource assessment and grid connection study; (2) Commercial proposal — customised offer with technology specifications and indicative pricing; (3) Development (Complete Plant model only) — detailed design and permit management; (4) Supply and installation — logistics, erection, commissioning and handover. The timeline from first contact to commissioning is typically 18–24 months.
Yes. NEAR is the only Italian operator that natively integrates WT turbines and ESS storage systems from the same supply chain. The integration between WT 6250 and ESS-C20-5015L is pre-validated and enables optimisation of the grid injection profile, reducing imbalances and improving the market value of the energy produced.
In the Complete Plant model yes: NEAR manages the entire authorisation process, including the EIA (Environmental Impact Assessment), single authorisation (AU) and grid connection procedures. In the Technology Only model the client manages authorisations independently; NEAR provides the required technical documentation.
WT 6250 turbines carry a base warranty of 5 years on main components (generator, gearbox, main bearing) and 2 years on electrical and control components. Extended O&M contracts (5, 10 or 15 years) with guaranteed availability of 97%+ are available. Remote monitoring is included from commissioning.
Yes. ESS-C20-5015L storage systems can be supplied alongside any wind or photovoltaic plant, not only our WT 6250. NEAR provides integration support and technical documentation for connection with inverters and control systems from third parties compatible with Modbus TCP/RTU, CAN and RS485 protocols.